2-Lite Sliding Windows
Summary of Works:
Remove an old aluminium sliding window
Replace with a modern sliding window (STD COLOURS)
Provide 5mm glass, flywire screens and keyed locks
Remove the rubbish and tidy the site
What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration: 3 hours to professionally install
Custom-Made • Professionally Installed • 15 Year Warranty
2-Lite and Lowlite Sliding Windows
Summary of Works:
Remove old rotted timber windows
Replace with a modern windout awning window
Provide 5mm glass, flywire screens and keyed locks
Remove the rubbish and tidy the site
What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration: 4 hours to professionally install
Custom-Made • Professionally Installed • 15 Year Warranty
3-Lite Sliding Windows
Summary of Works:
Remove an old rotted timber window
Replace with a modern sliding window
Provide 5mm glass, flywire screens and keyed locks
Remove the rubbish and tidy the site
What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration: 4 hours to professionally install
Custom-Made • Professionally Installed • 15 Year Warranty
3-Lite and Lowlite Sliding Windows
Summary of Works:
Remove an old rotted timber window
Replace with a modern sliding window
Provide 5mm glass, flywire screens and keyed locks
Remove the rubbish and tidy the site
What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration: 4 hours to professionally install
Custom-Made • Professionally Installed • 15 Year Warranty
Please note that price indications are based on the most common sizes we encounter, and exclude GST and our “per project” delivery and rubbish removal fee.
If you’d like help working out a budget for your own project, please give us a call – don’t forget to have your dimensions handy!