3 Panel Bifold Door

Before and after installation of Timber Bifold doors in Melbourne

Summary of Works:
Replace the old, outdated Timber Window
Create a larger opening including installation of a timber beam
Install a 3-door ECO Select Regrowth Forest Hardwood Bifold with access door
Install a Retractable Screen

What to Allow:
Leadtime: 10-12 weeks from order
Duration:  1 day to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

4 Panel Bifold Door

 

Before and after installation of Timber Bifold doors in Melbourne

Summary of Works:
Replace the old, outdated Timber Window
Create a larger opening including installation of a timber beam
Install a 4-door ECO Select Regrowth Forest Hardwood Bifold with access door
Install a Retractable Screen

What to Allow:
Leadtime: 10-12 weeks from order
Duration:  3 days to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

5 Panel Bifold Door

 

 

Before and after installation of Timber Bifold doors in Melbourne

Summary of Works:

Remove existing balcony, windows and doors.
Re-work upstairs & downstairs openings including installation of engineered steel lintels
Professionally install Victorian Ash KDHW 5 Panel Bifold Doors on ground floor and Awning & Feature Windows on upper floor.
Finish inside plasterwork, reveals and architraves
Fit new timber pre-primed weatherboards to external walls

What to Allow:
Leadtime: 10-12 weeks from order (plus permits)
Duration:  4 days to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

6 Panel Bifold Door

 

Before and after installation of Timber Bifold doors in Melbourne

Summary of Works:

Remove an external brick veneer wall in between two openings
Create a large 5.4 metre opening.
Install a 450 kilogram engineered beam and posts to support the second storey
Professionally install a 6-panelled Victorian Ash Timber Bifold door unit
Make good inside plasterwork and architraves
Relay brickwork and finish off external timbers

What to Allow:
Leadtime: 10-12 weeks from order (plus permits)
Duration:  3 days to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

Please note that price indications are based on the most common sizes we encounter, and exclude GST and our “per project” delivery and rubbish removal fee.
If you’d like help working out a budget for your own project, please give us a call – don’t forget to have your dimensions handy!

Quick Quote

    Name (required)

    Suburb (required)

    Email (required)

    Phone (required)

    How did you find us?

    Message

    Request Quote
    close slider

      Name (required)

      Suburb (required)

      Email (required)

      Phone (required)

      How did you find us?

      Message