Timber Double Hung or Sashless Windows

Timber Double Hung or Sashless Windows2023-07-18T12:54:29+10:00

Double Hung Sash Windows

Timber Double Hung

Summary of Works:
Remove old rotted timber window
Replace with a heritage tradition weights and cords double hung window
Pre-prime paint the window
Refit the traditional architraves, brass locks and lifts

What to Allow:
Time frame: 10-12 weeks for manufacturing, 4 hours to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

Dual Double Hung Windows with Fixed Centre Sash

Dual Double Hung Windows with Fixed Centre Sash

Summary of Works:
Remove an old 1950s steel window
Replace with a Vic Ash double hung fixed window
Provide modern Jambliner opening double hung sashes
Pre-prime Victorian Ash window in the factory/h5>

What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration: 5 hours to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

Double Hung Windows with Fixed Sash

Double Hung Windows with Fixed Sash

Summary of Works:
Remove an old steel window
Install a Victorian Ash double hung Jambliner corner window
Cover in the steel corner support post
Provide noise reducing laminated glass

What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration:  1 day to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

Sashless Windows

Sashless Windows

Summary of Works:
Remove an old aluminium sliding window
Replace with a tinted Sashless Double Hung Window
Provide flyscreen and keyed lock
Remove the rubbish and tidy the site

What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration:  4 hours to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

Sashless with Fixed Panes

Sashless with Fixed Panes

Summary of Works:
Remove the old aluminium window
Replace with a 4-panelled commercial sashless window
Provide flyscreens and keyed lock and safety glazing
Remove the rubbish and tidy the site

What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration:  1 day to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

Sashless with Fixed Centre

Sashless with Fixed Centre

Summary of Works:
Remove the old rotted timber window
Replace with a 3-panelled commercial sashless window
Provide flyscreens, keyed lock and safety glazing
Provide no bolt scaffolding to reach the 1st floor window
Remove the rubbish and tidy the site

What to Allow:
Leadtime: 10-12 weeks for manufacturing
Duration:  1 day to professionally install

Custom-Made • Professionally Installed • 15 Year Warranty

Please note that price indications are based on the most common sizes we encounter, and exclude GST and our “per project” delivery and rubbish removal fee.
If you’d like help working out a budget for your own project, please give us a call – don’t forget to have your dimensions handy!

Quick Quote

    Name (required)

    Suburb (required)

    Email (required)

    Phone (required)

    How did you find us?

    Message

    Request Quote
    close slider

      Name (required)

      Suburb (required)

      Email (required)

      Phone (required)

      How did you find us?

      Message